Flooring guides for Valley homes
The questions we answer most often on estimates, written down so you can decide before we ever knock on the door.
6 min read
Choosing Flooring for the Treasure Valley Climate
Indoor humidity here can swing from single digits in January to comfortable in June. That swing, not the showroom sample, is what decides whether a floor stays flat.
Read the guide →7 min read
LVP vs Laminate vs Engineered Hardwood: How to Choose
These three cover most Treasure Valley projects. They fail in different ways, and that is the useful way to compare them.
Read the guide →5 min read
Subfloor Prep: What Actually Happens Before Your Floor Goes Down
Almost every flooring complaint we get called about traces back to what was — or was not — done to the subfloor.
Read the guide →5 min read
How Long a Flooring Installation Really Takes
Most whole main-floor projects are a few days of work inside a two to four week overall timeline. Here is where the time actually goes.
Read the guide →
Ready to talk floors?
Send us the rooms and rough square footage and we will schedule an in-home measure.